Filter by:

Civil & Environmental Engineering Final Capstone Presentations

Thursday June 4th 2026 3:30 PM - 5:30 PM

Civil & Environmental Capstone Groups will present their final projects. Come check out the hard work and incredible engineering designs these students have been putting together over the past few months.

Presentation Schedule TBA

List of projects:

  • Tualatin Floodplain Study
  • Tualatin Hedges Creek Stormwater Management Study
  • Tualatin Boones Ferry Walkability Study
  • Union Station Structural Upgrade
  • Green Loop Transportation Study
  • Kernside Transportation Improvements
  • PSU New Housing Building Structural Design
  • Coastal Property Development