Art & Design Building

Art & Design


Project Title: 
Art & Design

Project Overview:
The Art & Design project also known as Gateway Center is set to redefine the campus landscape and elevate PSU's commitment to sustainability, wellness, and excellence in higher education. One of the project's standout features is its use of mass timber construction as opposed to the conventional use of concrete. This project will be PSU's first building constructed with this sustainable and resilient construction method, championing both environmental responsibility and occupant wellness. The project aspires to achieve LEED Gold certification, reflecting a commitment to green building practices and eco-conscious design. A notable feature of the A&D Gateway Center is its integration with the City of Portland Green Loop, connecting seamlessly to the north side of the building. This integration not only enhances the accessibility of the future building but also revitalizes the adjacent park blocks, contributing to the city's urban development. With an anticipated fall 2024 groundbreaking, the project is expected to reach substantial completion by the spring of 2026.

Project Budget:
The project has reached a significant milestone by becoming fully funded as of July 2023 from additional State bond measures.

Current Status:
The A&D project is in its later stages of design development, poised to transition into the early construction documentation phase in Fall 2023. The project team is actively engaged in onboarding efforts, gearing up for the next steps in this transformative undertaking.    

Key Partners:
The success of this venture is a result of collaboration with key partners, including Lever (Architect) and Swinerton (General Contractor), as well as a diverse array of design and construction consultants and specialists from various disciplines. Together, along with various PSU grounds including staff and students, this collective effort will shape the successful future of this project.